Skip to content
LitLink LitLink
Looking Glass Talk to sales
Newsroom

Network updates and announcements

LitLink lights a second 100G path between Frankfurt and Vilnius
Network

LitLink lights a second 100G path between Frankfurt and Vilnius

The new wave runs over a diverse route via Warsaw, giving the Baltic edge two fully independent paths into central Europe.

28 Aug 2026
New point of presence live in Jakarta, extending Southeast Asia reach
Expansion

New point of presence live in Jakarta, extending Southeast Asia reach

The Jakarta edge is dual homed to Singapore and Kuala Lumpur and peers locally at the national exchange.

16 Jul 2026
Open peering policy published, now present at eleven exchanges
Peering

Open peering policy published, now present at eleven exchanges

AS213476 moved to an open policy and added IX.br Sao Paulo and DE-CIX Mumbai this quarter.

09 Jun 2026
Edge scrubbing capacity doubled across all European PoPs
Security

Edge scrubbing capacity doubled across all European PoPs

In region scrubbing now handles 2.4 Tbps aggregate, with detection under ten seconds on every customer prefix.

21 May 2026
RPKI route origin validation enforced on all sessions
Network

RPKI route origin validation enforced on all sessions

Invalid announcements are dropped at every edge. Customer prefixes without ROAs received 90 days of notice.

30 Apr 2026
LitLink opens 24/7 NOC shift in Singapore
Company

LitLink opens 24/7 NOC shift in Singapore

The APAC desk brings follow the sun coverage, with engineers in Vilnius and Singapore handing over twice a day.

12 Mar 2026
Africa footprint reaches six metros with Nairobi and Pretoria
Expansion

Africa footprint reaches six metros with Nairobi and Pretoria

Both edges connect to the backbone via protected subsea capacity landing in Mombasa and Cape Town.

18 Feb 2026
Per customer DDoS reporting API now generally available
Security

Per customer DDoS reporting API now generally available

Every mitigation event is available as JSON within a minute, ready to forward to downstream customers.

27 Jan 2026
Annual network report: 9 Tbps of edge capacity, 99.995% measured availability
Company

Annual network report: 9 Tbps of edge capacity, 99.995% measured availability

The 2025 report covers capacity growth, incident statistics and the roadmap for 2026.

08 Jan 2026

Press and analyst enquiries

Logos, network facts and spokesperson availability from the communications team.

[email protected]